John Wheatley College, East End Campus, Glasgow
| Contact Details: | Ian Graham, Principal: igraham@jwheatley.ac.uk Alex Kirk, Depute Principal: akirk@jwheatley.ac.uk |
| Type of Project: | New build. A proportion of the funding was part of the Scottish Funding Council's regeneration of FE estate funding. The College's existing Shettleston building was no longer fit for purpose. |
| Start/End Date: | The building was handed over to John Wheatley College on 12 March 2007. |
What Are Your Top Tips..
...For a successful new build? For embedding IT? For installing technology?
Plan well ahead. The user brief for the building was prepared two years before the design of the building started.
Involve all staff in the preparation of the user brief and the revisions during design stage. Groups of staff meeting directly with the architect worked very well.
Have a defined management control system with only one person responsible for advising the design team and contractor.