Skip to content

good practice and innovation
about us infoKits Tools & Techniques Publications Events
You are here: Home » infoKits » Learning Spaces » Resource Collection » Case Studies » Case Study: New College Durham » New College Durham Case Study: Post Occupancy

Planning and Designing Technology Rich Learning Spaces

  Anticipation
  Imagination
  Implementation
  Evaluation
  Resource Collection
inc. case studies, flickr photo library, virtual campus and further resources

New College Durham


Contact Details: John Widdowson, Principal & Chief Executive, john.widdowson@newdur.ac.uk
Lynn Bertram, Executive Support Manager, lynn.bertram@newdur.ac.uk
Alan Race, Assistant Director IT and Purchasing, alan.race@newdur.ac.uk
Type of Project: New Build on existing site.
Start/End Date: Started work on site January 2003 with a year's design work previously. Build completed September 2005

Post Occupancy: Changes Made As A Result Of Feedback

They haven't made any changes yet as this is a prototype set up to get feedback for the second phase in a new build.

So far changes have been due to changes in the curriculum, student feedback and changes in the pattern of enrolment. e.g., the space devoted to Beauty Therapy was increased as the build was going up.

The revolving front doors have been replaced. The College had doubts about them from the start although the design team thought them feasible based on a comparison with airport throughput.


Bookmark and Share
If you can read this text, it means you are not experiencing the Plone design at its best. Plone makes heavy use of CSS, which means it is accessible to any internet browser, but the design needs a standards-compliant browser to look like we intended it. Just so you know ;)