Newham College of Further Education, London
| Contact Details: | Philip.Badman@newham.ac.uk Brian.Cooper@newham.ac.uk |
| Type of Project: | Refurbishment to create two 'concept classrooms' on the East Ham and Stratford campuses. The East Ham development centres on three c.50m2 classrooms being converted into one new learning suite. The work at Stratford will begin summer 2007. |
| Start/End Date: | East Ham Campus trial due to open March 2007. Stratford Campus trial site will go into construction over the summer 2007. |
Post Occupancy: Changes Made As A Result Of Feedback
The only change is to the shape of the interactive desks. Initially the plan was for circular desks. They actually painted everything on the floor first to see how it all fitted in and found that what looks good on a drawing doesn't necessarily look good or work in reality. The desk was changed to more of an oval shape at nil cost because the manufacturers provided both types of desk.